Number of items: 19. AAcharyya, K.K. (1993) Functional relation of particle sizes with the ash-contents of coals. Indian Journal of Technology , 31 (9). pp. 641-644. ISSN 0019-5669 Acharyya, K.K. and Sengupta, S.K. (1993) Functional relation of ash-content with bulk density of coals. Indian Journal of Technology , 31 (11). pp. 787-790. ISSN 0019-5669 BBhattacharyya, M.M. and Paul, R.K. (1993) studies into the deflagration characteristics of explosives. Journal of Mines, Metals & Fuels, 41 (1). pp. 7-13. ISSN 0022-2755 CChakraborty, A.K. and Jethwa, J.L (1993) Blasting Technique for faster Drivage - A case study. Journal of Mining Research , 2 (2). pp. 21-33. ISSN 0971-1899 DDhar, B.B. and Ahmad, Mobin (1993) Impact of Mining and Processing Activities on Surrounding environment - A Case Study. Journal of Mining Research , 2 (2). pp. 34-41. ISSN 0971-1899 GGhosh, A.K. and Prasad, Shankar and Ghosh, C.N. (1993) Stability analysis of cemented backfill column in VRM stopes during tertiary extraction of stope-pillars in Rajpura Dariba Mine. Journal of Mining Research , 2 (2). pp. 1-14. ISSN 0971-1899 Ghosh, A.K. and Rao, D.G. and Sinha, A. and Dhar, B.B. (1993) Feasibility of Horizontal Cut-&-fill Stoping above an Inclined shaft at great depth- A 2D BEM Analysis. Journal of Mining Research , 2 (1). pp. 27-40. ISSN 0971-1899 Gupta, M.L. and Panigrahi, D.C. and Varma, N. K. and Pandey, J.K. (1993) Determination of Virgin Rock Temperature in Raniganj Coalfield. Journal of Mining Research , 1 (4). pp. 11-17. ISSN 0971-1899 KKushwaha, A. and Singh, V.K. and Singh, J.K. and Singh, Raghwendra and Singh, T.N. (1993) Application of Numerical Modelling for wide stall Mining. Journal of Mining Research , 2 (1). pp. 17-26. ISSN 0971-1899 NNag, Deba Prasad and Mitra, Dinesh Chandra and Banerjee, Sukumar and Raja, K. and Haque, R. (1993) Studies on blending of coals for coking using solvent refined coal. Journal of Mines, Metals & Fuels, 41 (1). pp. 20-29. ISSN 0022-2755 PPrasad, Mohan and Dhar, B.B. (1993) Stability Simulation of Caprock for Mining with Sublevel Open Stoping : A Hypothetical case. Journal of Mining Research , 2 (1). pp. 9-16. ISSN 0971-1899 RRoy, T. R. (1993) A Simplified Computational approach for Prediction of Transient Climatic Conditions in Underground Mine Airways. Geotechnical and Geological Engineering , 11 (1). pp. 15-23. ISSN 0960-3182 SSingh, A.K. and Banerjee, B.D. (1993) An Investigation into the relationship between methane emission and rate production in Indian Mines. Minetech, 14 (3). pp. 40-42. ISSN 0970-7204 Singh, K. B. and Jethwa, J.L (1993) Ground Movements due to Multi-Seam working with Hydraulic Sand stowing at Inder Colliery of Kamptee Coalfield. Minetech, 14 (5). pp. 5-10. ISSN 0970-7204 Singh, R.S. (1993) Effect of Winter fire on primary productivity and nutrient concentration of a dry tropical savanna. Vegatatio, 106 (1). pp. 63-71. ISSN 1385-0237 Singh, Rajendra and Kushwaha, A. and Singh, T.N. (1993) Geotechnical Evaluation of a Mechanised Longwall - Soutirage Face. Minetech, 14 (5&6). pp. 42-45. ISSN 0970-7204 (In Press) Singh, T.N. (1993) Coal mining Horizons of the united States. Minetech, 14 (3). pp. 30-39. ISSN 0970-7204 Singh, V.K. and Singh, D.P. (1993) Correlation between point load index and compressive strength for quartzite rocks. Geotechnical and Geological Engineering , 11 (4). pp. 269-272. ISSN 0960-3182 TTiwary, R.K. and Ghosh, S.K. (1993) Managing aqueous solutions rich in Mn(II): An inexpensive technique. Colloids and Surfaces A: Physicochemical and Engineering Aspects , 70 (2). pp. 131-137. ISSN 0927-7757 |