Kumar, Priyesh and Trivedi, Ratnesh (2019) Optimum Utilization of Continuous Miner for Optimization of Production in Board and Pillar Mining Method in Indian Underground Coal Mines. Indian Mining & Engineering Journal , 58 (5-6). pp. 17-23. ISSN 0019-5944

Full text not available from this repository. (Request a copy)

Abstract

In present contest with the past, production optimization has become important goal for industries. With reference to past few decades’ underground coal mining operations uses continuous mining technology to extract coal reserves from the underground coal seams. Matching with the continuous miner shuttle cars are used to transport the coal from the face to a feeder breaker. After that, coal is generally tilted over the conveyor system in underground that transport to the surface for distribution to consumers most of power generation plant of India. The availability of coal and methods of mining plays the key role, but in this area of continuous technology, miner feels a safe and environment-friendly path for increasing the overall production. Technology suits for obtaining the target production according to Indian coal seams occurrence as per geological structures. Productivity may improve by effective management of breakdown of the using machineries. This paper is purpose to identify the various factor and problems affecting the productivity of the underground coal mine.

Item Type: Article
Subjects: Envieronmental Management Group
Divisions: UNSPECIFIED
Depositing User: Mr. B. R. Panduranga
Date Deposited: 13 Jun 2019 07:21
Last Modified: 13 Jun 2019 07:21
URI: http://cimfr.csircentral.net/id/eprint/2017

Actions (login required)

View Item View Item