Mandal, S.K and Singh, M.M. (2000) Failure Rates Vis-A-Vis Production from Longwall Faces - a case study. Coal International , 248 (2). pp. 54-56.

Full text not available from this repository. (Request a copy)

Abstract

The high productive underground longwall mining method requires proper assessment of serviceability of each component of each sub-system for maintenance management and minimisation of repair time to maximise the utilisation. The paper, here, considering the pit head information, firstly assesses the breakdown for five longwall faces of two sub-systems and than categorised them into various modules or components for two sub-systems viz. shearer and armoured flexible conveyor (AFC) to evaluate the failure rates for each component. The paper then considering the average production per hour have attempted to emphasise the possibility in increase in production by varying the combined failure rates (shearer and AFC) for each face.

Item Type: Article
Subjects: Blasting
Divisions: UNSPECIFIED
Depositing User: Dr. Satyendra Kumar Singh
Date Deposited: 29 Nov 2011 05:39
Last Modified: 29 Nov 2011 05:39
URI: http://cimfr.csircentral.net/id/eprint/176

Actions (login required)

View Item View Item