Pal Roy, P. and Sawmliana, C and Singh, Rakesh Kumar and Basu, Prasun and Dey, S. (2012) Design Methodology of man-winding shaft at Adriyala longwall project near OC-II mine of SCCL. Journal of Mines, Metals & Fuels, 60 (7&8). pp. 139-145. ISSN 0022-2755
Full text not available from this repository. (Request a copy)Abstract
The Singareni Collieries Company Limited (SCCL) proposed to construct a new man-winding shaft of 6m finished diameter and 180 m deep from surface. The shaft will be located at 250 m away from the highwall of OCP-II, RG-III Area. it will be used for man-winding which will connect no. I seam, nearer to the punch entries. The shaft will have cage which is proposed to run on guide-ropes with a capacity of 24 people at a time. The present paper highlights the scientific investigations carried out by CIMFR to assess to stability of the proposed shaft due to nearby opencast blasting as well as to recommend effective and safe design of the shaft lining in order to withstand ground vibration generated by OCP-II blasting
Item Type: | Article |
---|---|
Subjects: | Blasting |
Divisions: | UNSPECIFIED |
Depositing User: | Dr. Satyendra Kumar Singh |
Date Deposited: | 02 Jan 2013 05:54 |
Last Modified: | 02 Jan 2013 05:54 |
URI: | http://cimfr.csircentral.net/id/eprint/1401 |
Actions (login required)
View Item |